MASAR
Quick test
Rules run locally — no bridge call.
Every Phase 1 completion date must fall on or before 2027-09-30.
Chapter 4 — Master Plan · 4.2 Zonal Phasing
Site Readiness SAR value must not exceed 12B without an explicit legacy-justification note in the same document.
Chapter 5 — Capital Plan · 5.3 Site Readiness
Pavilion height must not exceed 25m per the BIE Technical Regulation 14.2.
BIE Technical Regulations · §14.2